In summary, from 23 December 2010, building work that will be added to the current list of exempt work is:
1. altering, finishing or replacing parts of ceilings
2. penetration must be no greater than 30cm diameter for passages for cables and wires.
3. installation of insulation in existing buildings.
Constructing, installing, replacing, or altering any:
1. any structural support of a sign has to been designed by a professional engineer
2. height restriction of gantry
3. ground level for a carport must not exceed 20 square meters
Make comment to the non -consented building in your own words Good work with posting our building
ReplyDelete