Sleepout Time Management

21.2.2011-23.2.2011 week 1: Induction Day, Health and Safety, Outside Games,Hand tool exercises.

28.2.2011-2.3.2011   week 2: Workshop exercises, Hand tool exercises,Plan reading,joint exercise,  Group role play,Library.

7.3.2011--9.3.2011    week 3: Computer lab,hand tool and power tool health and Safety, Drawing Board,joint exercise plan reading.

14.3.2011-16.3.2011 week 4: Reading plans,Site Set out,workshop Drawing Board,Profile set out lab, Started lay out for sleep out

21.3.2011-23.3.2011 week 5: Reading plans,sleep out discussion, workshop saw horse.laying out floor joist for sleep out, lab.

28.3.2011-30.3.2011 week 6: Sleep out details,floor plan elevation details cross sections saw horse, set out racking walls,lab.

4.4.2011--6.4.2011   week 7: sleep out set out Wall framing sliding door,set out of roof rafters.
   
11.4.2011-13.4.2011 week 8: Sleep out building,walls,rafters,purlins,studs.

2.5.2011--4.5.2011    week 9: sleep out paper fascia board ,metal roofing.

9.5.2011--8.5.2011    week 10: building wrap,windows,exterior cladding.

16.5.2011-18.5.2011  week 11: Sleep out building, starting of insulation.

23.5.2011-25.5.2011  week 12: Sleep out building, insulation,rondo clips & batterns.

30.5.2011-1.6.2011    week 13: Sleep out gutter and fixtures started

6.6.2011---8.6.2011   week 14: Sleep out gutter and fixtures finished

13.6.2011-15.6.2011 week 15: sleep out completed, cleaning up area around sleep out

20.6.6.2011-22.6.2011 week 16: Emit final tests, finishing blogs

27.6.2011---29.6.2011 week 17: course finished BBQ 

Tuesday, 14 June 2011

10 BBQ Table

 What are the quantity's of timber required to construct the BBQ table.
x14 820x1500
x3 820x1500
x4 900x50
x3 75x40
 
What are the different sizes of timber used to construct the BBQ table.
100x150
90x45
75x40

What height is the BBQ table top from ground level.
12inchs

What is the lenght of the table top.
1500m

Tuesday, 7 June 2011

12 Rondo Batterns and walls,ceiling, Insulation

How is the Rondo ceiling Batterns fixed and cut?
The rondo ceiling batterns are cut to the length of the back wall and fixed using rondo clips

Describe the method to cut and to fix rondo battern?
to cut and fix the rondo we measure it to the size you desire, you cut the rondo using tin snips and fix it to the interior roof using rondo clips

What is the other type of battern that can be used?
Wood Type Battern

What type of insulation are we using in our sleepout?
Fibreglass Batt Insulation for roof and walls

What sizes are we using.... (Insulation)?
Roof Insulation Size - 5700x3100 (5.7m x3.1m)
Wall Insulation Size -  1200x2400 (1.2mx2.4m)