Sleepout Time Management

21.2.2011-23.2.2011 week 1: Induction Day, Health and Safety, Outside Games,Hand tool exercises.

28.2.2011-2.3.2011   week 2: Workshop exercises, Hand tool exercises,Plan reading,joint exercise,  Group role play,Library.

7.3.2011--9.3.2011    week 3: Computer lab,hand tool and power tool health and Safety, Drawing Board,joint exercise plan reading.

14.3.2011-16.3.2011 week 4: Reading plans,Site Set out,workshop Drawing Board,Profile set out lab, Started lay out for sleep out

21.3.2011-23.3.2011 week 5: Reading plans,sleep out discussion, workshop saw horse.laying out floor joist for sleep out, lab.

28.3.2011-30.3.2011 week 6: Sleep out details,floor plan elevation details cross sections saw horse, set out racking walls,lab.

4.4.2011--6.4.2011   week 7: sleep out set out Wall framing sliding door,set out of roof rafters.
   
11.4.2011-13.4.2011 week 8: Sleep out building,walls,rafters,purlins,studs.

2.5.2011--4.5.2011    week 9: sleep out paper fascia board ,metal roofing.

9.5.2011--8.5.2011    week 10: building wrap,windows,exterior cladding.

16.5.2011-18.5.2011  week 11: Sleep out building, starting of insulation.

23.5.2011-25.5.2011  week 12: Sleep out building, insulation,rondo clips & batterns.

30.5.2011-1.6.2011    week 13: Sleep out gutter and fixtures started

6.6.2011---8.6.2011   week 14: Sleep out gutter and fixtures finished

13.6.2011-15.6.2011 week 15: sleep out completed, cleaning up area around sleep out

20.6.6.2011-22.6.2011 week 16: Emit final tests, finishing blogs

27.6.2011---29.6.2011 week 17: course finished BBQ 